The supervisory director with an annual salary of 500,000 when bidding is the defense
As a director, I often have to defense for bidding, but the questions that the owner asked each time is similar. In order to make the directors feel at a loss when the defense is answered, I have summarized the relevant questions according to the experience of the defense and conducted a systematic sorting out systematically. It is for reference only (non -standard answers, different understanding of each company and people).
How to evaluate the personnel inside the supervision project department? How is the internal management?
Answer: The main assessment indicators are: attendance rate, work initiative, integrity and self -discipline, work performance (the ability to find problems, the ability to solve problems, coordination ability, etc.).
The internal is mainly managed through the form of vertical leadership with clear division of labor and clear responsibility.
What are the sides?
Answer: It mainly refers to the key parts and key processes of the building, such as earthwork backfill, concrete irrigation piles, continuous walls, soil nail walls, rear -pouring bands and other structural concrete, waterproof concrete, coil waterproof detailed structure treatment treatment , Steel structure installation, beam -column node steel hidden process, concrete pouring, prestressed tensile, pre -stress tensile, assembled structure installation, steel structure installation, mesh structure installation, cable film installation.
The main contents of the side site are: check the quality inspection personnel of the construction unit, the material and machinery of the materials, whether the material and machinery are constructed in accordance with the construction plan, and the implementation of the implementation of the implementation plan.
How to review the construction plan and which aspects should I consider?
Answer: Should we focus on whether it is reasonable for engineering technology and economy? , Guarantee measures for safe and civilized construction control, whether the quality assurance system is complete, whether the management structure is sound, etc.
How to coordinate the relationship between Party A subcontracting and the total bag?
Answer: It is best to ask Party A’s subcontracting to be included in the management of the total bag, and pay a certain cooperation fee. Of course, the most important interface, distinguish responsibility, do a good job of handover, clear the work plan on the transfer form next work plan next work plan , Clarify the responsible subject of delay in construction period.
How to use the right of supervision engineers?
Answer: Put a sentence: Bold use of your power and sign your name carefully. If the owner attaches great importance to the rights of supervisors, then the supervisory engineer cannot relax the supervision power at the beginning of the project. It is difficult to start with everything, and everything has to be loose. Supervisor engineers can exercise their rights seriously in engineering model approval, concealment of engineering acceptance, and do not relax. Do not relax. If there is no rectification, do not sign, do not sign the quality standards. When you do n’t let the construction unit have any excuses, do it to make the construction unit take orally, and win the respect of the construction unit. Then, the rights of supervision engineers will naturally be improved.
How do you control safety?
Answer: Safety is the top priority. I want to control the safety from two aspects:
The first point is to form a comprehensive inspection and rectification system. Daily safety inspections are essential. If there is a problem, communicate with the construction unit in real time. Then, the monthly safety inspection plan and the weekly inspection focus are formulated, such as Last week, the outer rack was focused on the outer frame. This week, the entrance of the edge of the edge was checked, and the safety inspection was inspected next week. The weekly safety inspection was jointly carried out by three aspects of the safety director of the competent engineer and the construction unit. The inspection situation forms a complete inspection record every month. When the inspection records of this month have more than 30 points (agreed in advance), the safety and civilized construction fee can be deducted from approved.
As a prerequisite, the second point is economic measures. The owner must list the safety civilization fees separately in the construction contract (deducting the cost of affecting the construction progress, such as outer frames, construction elevators, etc.) The construction cycle states that the cost that can be applied per month. If this is done, there is no excuse for construction units and will not affect the construction progress. The safety responsible person of the building (if there are multiple buildings at the same time), the list of safety responsible persons of each single safety (such as the outer frame, the electricity safety of the electricity, the entrance of the cross -border hole, the illegal construction, etc.) Before the construction channel of the building, every inspector and manager knew who was responsible for, and implemented the responsibility of safety management to the specific individual. Enter your content here. Be careful not to delete all text with the backbone key. Please keep one or input it directly with the mouse to prevent the format from chaos.
Among the four major control, which aspect do you focus on?
Answer: I think safety is the most important, followed by quality, progress, and finally investing. Because security is related to life. Nowadays, the whole society is advocating a harmonious society. The most important point of a harmonious society is to care for life and cherish life. Life is irreversible. Safety accidents occur, and they are injured. Losses, can quality accidents be renovated and renovated. Can safety accidents be rework?